Project Information | |
Project:
|
Auburn Community Commons - Development Plan |
Revision:
|
Preliminary |
Type:
|
Development Plan |
Logos ID:
|
PROJ-PUBLIC - 2020-00000002 |
Due Date:
|
Jan 15, 2020 |
Reviewer Information | |||
Name:
|
Daryl McConnell | ||
Dept.:
|
Engineering | ||
Phone:
|
Comments (add more numbers and pages, if necessary) |
2. A storm sewer tap will also be necessary to service this new facility with direct connection to the roof drain system as to not shed water run-off onto adjacent properties to the north and west. There are currently no dedicated storm sewers in this area, only combination sewers. However, there are intentions to install a new dedicated storm sewer down 6 th Street within the next 2 years. A new storm sewer tap could be run parallel with a new sanitary sewer tap, possibly to the north towards 6 th Street, through the north-adjoining property of “Snyder”. Once into the right of way of 6 th Street, the storm tap could be connected to the sanitary tap and allowed to temporarily drain to the combination sewer. At such time when a new dedicated storm sewer is installed, the storm sewer would be disconnected from the sanitary tap and tied into the new storm sewer.
Recommended Action | |||
Approve | |||
X | Approve with Comments | ||
Revise and Resubmit | |||
Other: |