CHAPTER 163 AUBURN BUILDING CODE FEE SCHEDULETable of Contents Section 163.10 Fees163.10 FEESThe following fees shall be paid to the city prior to issuance of a site improvement permit.
2) $90 minimum.
3) Remodeling or alteration, site-built or manufactured structure:
a) $.06 per square foot of gross floor area to be remodeled or altered.
b) Temporary service, $25.
2) Electrical premise wiring:
a) One-family and two-family dwelling, new construction, remodeling or alteration: 1) $25 per dwelling unit.
3) Plumbing: drain, waste and vent (DWV), potable water or non-potable water:
a) New construction or addition, $.02 per square f...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
Chapter 163 - Auburn Building Code Fee Schedule.pdf